Wells Fargo IN2

Golden, CO (@NREL)

RISE:NYC is a competition designed to identify and deploy creative new technologies and solutions to make New York City businesses more resilient to the impacts of future storms, sea level rise and other effects of climate change. Through the competition, up to $30 million is available to fund projects that use innovative measure to make the city's buildings and infrastructure networks in areas impacted by Hurricane Sandy and/or vulnerable to future storms more resilient.


Go Electric Deliverables:  Three 30KW and one 250KW LYNC DR systems installed at small businesses impacted by Hurricane Sandy.


Click here for more information about RISE:NYC


MILESTONES:

Site Selection & Planning underway

Equipment installations starting Q4 2017

RISE : NYC

New York City

Metro AREA

go electric inc. projects

SPIDERS PHASE III 

Camp Smith, hi

SPIDERS (Smart Power Infrastructure Demonstration for Energy Reliability and Security) is a joint effort between the Department of Defense, the Department of Energy, and the Department of Homeland Security to incorporate cyber-secure micro grid solutions that enhance continuity of operations at DoD bases in the face of electrical power disruptions.


Go Electric Deliverables: 2MW micro grid consisting of two 250KW ISIMs (Integrated battery Storage and Inverter Modules); two 725 kW Caterpillar generator; microgrid integration and control of 3.5MW generation & storage and integration with the cyber-secure base-wide micro grid. 


Click here for equipment Specification

Click here for information about SPIDERS


MILESTONES:

Commissioning: Completed

SPIDERS Industry Day:   August 27, 2015  

Operational Demonstration: Completed Jan 2016

Wells Fargo IN² focuses on fostering scalable commercial buildings technologies that will lead  to a more sustainable future by helping reduce overall energy impact, conserve natural resources and create jobs. IN² was designed to help innovative clean technologies get out of the labs and into the marketplace. The program leverages Wells Fargo’s geographic diversity and expertise in clean energy and commercial buildings to provide early-stage entrepreneurs an accelerated path toward commercialization.


Go Electric Deliverables:  One 30KW LYNC DR for performance and demand response capability validation at the National Renewable Energy Lab.


Click here for more information about Wells Fargo IN2


MILESTONES:

Deliver LYNC DR to NREL Jan 2017

System performance and demand response validation QTR 1&2, 2017

Tooele Army Depot

Tooele, UT

Tooele Army Depot (TEAD) is a premier active joint ammunition storage site.  Tooele is responsible for shipping, storing, receiving, inspecting, demilitarization, and maintaining training and war reserve conventional ammunition.  Tooele’s Ammunition Equipment and Manufacturing Directorate (AEMD) designs and manufacturers ammunition peculiar equipment (APE) used in maintenance and demilitarization of munitions for all of the Department of Defense (DoD).  The Army Core of Engineers has awarded a Design-Build Task Order for a Micro Grid at Tooele.


Go Electric Deliverables:  One 1000KW/1000KWH LYNC DR and micro grid integration engineering.


Click here for more information about Tooele Army Depot


MILESTONES: to be announced

Announcements coming soon:  Three new projects in Hawaii!