Wells Fargo IN² focuses on fostering scalable commercial buildings technologies that will lead  to a more sustainable future by helping reduce overall energy impact, conserve natural resources and create jobs. IN² was designed to help innovative clean technologies get out of the labs and into the marketplace. The program leverages Wells Fargo’s geographic diversity and expertise in clean energy and commercial buildings to provide early-stage entrepreneurs an accelerated path toward commercialization.


Go Electric Deliverables:  One 30KW LYNC DR for performance and demand response capability validation at the National Renewable Energy Lab.


Click here for more information about Wells Fargo IN2


MILESTONES:

Deliver LYNC DR to NREL Jan 2017

System performance and demand response validation QTR 1&2, 2017

The demonstration microgrid project at the Fort Custer Training Center in Michigan is aimed at reducing costs for energy surety where military facilities are in close proximity to each other. Advanced technology developer Electricore will lead the project with support from power company Eaton, Go Electric, and local utility Consumers Energy. The Michigan Army National Guard will serve as project host.

The microgrid will include 1.375 MW of legacy diesel generators, as well as 400 kW of energy storage and 720 kW of photovoltaics (PV). When completed in 2018, the project is expected to enhance power surety, energy resilience, distributed generation management and demand response, while contributing to the critical power needs of nearby military installations.

The DOD’s Environmental Security Technology Certification Program (ESTCP) funded the project to demonstrate the ability of microgrids to offer continuous power to critical resources during extended outages. The project will also showcase the sharing of resources between Ft. Custer, a federally owned and state-operated Michigan Army National Guard training facility, and nearby federal facilities


Go Electric Deliverables:  One 400KW/167KWH BESS and engineering services and support.

Tooele Army Depot (TEAD) is a premier active joint ammunition storage site.  Tooele is responsible for shipping, storing, receiving, inspecting, demilitarization, and maintaining training and war reserve conventional ammunition.  Tooele’s Ammunition Equipment and Manufacturing Directorate (AEMD) designs and manufacturers ammunition peculiar equipment (APE) used in maintenance and demilitarization of munitions for all of the Department of Defense (DoD).  The Army Core of Engineers has awarded a Design-Build Task Order for a Micro Grid at Tooele.


Go Electric Deliverables:  One 1000KW/1000KWH LYNC DR and micro grid integration engineering.


Click here for more information about Tooele Army Depot


MILESTONES: to be announced

Oahu & Big island

RISE:NYC is a competition designed to identify and deploy creative new technologies and solutions to make New York City businesses more resilient to the impacts of future storms, sea level rise and other effects of climate change. Through the competition, up to $30 million is available to fund projects that use innovative measure to make the city's buildings and infrastructure networks in areas impacted by Hurricane Sandy and/or vulnerable to future storms more resilient.


Go Electric Deliverables:  Three 30KW and one 250KW LYNC DR systems installed at small businesses impacted by Hurricane Sandy.


Click here for more information about RISE:NYC


MILESTONES:

Site Selection & Planning underway

Equipment installations starting Q4 2017

RISE : NYC

New York City

Metro AREA

go electric inc. projects

SPIDERS PHASE III 

Camp Smith, hi

SPIDERS (Smart Power Infrastructure Demonstration for Energy Reliability and Security) is a joint effort between the Department of Defense, the Department of Energy, and the Department of Homeland Security to incorporate cyber-secure micro grid solutions that enhance continuity of operations at DoD bases in the face of electrical power disruptions.


Go Electric Deliverables: 2MW micro grid consisting of two 250KW ISIMs (Integrated battery Storage and Inverter Modules); two 725 kW Caterpillar generator; microgrid integration and control of 3.5MW generation & storage and integration with the cyber-secure base-wide micro grid. 


Click here for equipment Specification

Click here for information about SPIDERS


MILESTONES:

Commissioning: Completed

SPIDERS Industry Day:   August 27, 2015  

Operational Demonstration: Completed Jan 2016

LinkedIn
Go Electric Inc. Facebook

Recent News


July 25, 2017 Go Electric is Awarded a $1.7M Contract with Tooele Army Depot. Click here for press release.

June 21, 2017 Go Electric featured in Pacific Business News. 

Click here for article.

June 12, 2017 Go Electric Thank you byline to the State of Indiana featured in Inside Indiana Business. 
Click here for article.

Go Electric Inc. Twitter

Go Electric Inc. © ALL RIGHTS RESERVED.

LinkedIn
Go Electric Inc. Twitter
Go Electric Inc. Facebook

Tooele Army Depot

Tooele, UT

Logo

Wells Fargo IN2

Golden, CO (@NREL)

Shhh.... we can't tell you about our new projects in Hawaii yet so stay tuned!

Ft. custer Training Center

Michigan